Search
Contact
Symbolbild zur Umsetzung der IED-Novelle: Metallrohre
13.01.2025 | KPMG Law Insights

IED: First legislative package to implement the EU directive is available

The new EU Industrial Emissions Directive (IED) came into force on August 4, 2024 and must be implemented by the member states by July 2026. A first implementation package is now available. At the end of November, the Federal Ministry for the Environment, Nature Conservation, Nuclear Safety and Consumer Protection (BMUV) published the draft of an umbrella law and an umbrella ordinance with which large parts of the IED are to be transposed into national law. The relevance for industry is considerable: the IED affects around 55,000 installations in Europe, 13,000 of which are in Germany alone. It applies to almost all branches of industry.

These laws are to be amended by the first implementation package

Various laws are to be amended by the Mantelgesetz, in particular

  • the Federal Immission Control Act (BImSchG),
  • the Closed Substance Cycle Waste Management Act (KrWG),
  • the Federal Mining Act (BBergG),
  • and the Environmental Appeals Act (UmwRG).

The framework ordinance provides for amendments to the 4th, 5th, 9th, 11th, 17th and 44th Federal Immission Control Ordinance (BImSchV). Furthermore, a new 45th BImSchV, the IE Management Ordinance or Ordinance on the Implementation of Management Specifications and Environmental Performance Values in Industrial Plants, is to be adopted. In addition to this, the General Ordinance also contains amendments to the Landfill Ordinance (DepV), the Substitute Building Materials Ordinance (ErsatzbaustoffV) and the Waste Management Officer Ordinance (AbfBeauftrV). The intended range of amendments already shows that the IED amendment requires comprehensive adjustments to various environmental regulations. Subsequent implementation packages will have to regulate amendments to the Water Resources Act (WHG) and the TA Luft, among others.

The Mantelgesetz provides for significant changes to the BImSchG

Numerous amendments to the BImSchG are planned that will directly affect operators of IED systems. The main new feature is that plant operators will have to pay compensation if breaches of operator obligations lead to damage to health. Overall, the operator obligations under Section 5 BImSchG are to be extended. In the event of certain breaches, the operation of the plant can even be prohibited “immediately”, for example in the event of health hazards and significant environmental hazards. The licensing requirements for modular systems will be adapted and supplemented. Modular plants are characterized by a diversity and variation of process types or substance classes in production and thus guarantee competitiveness, for example in the chemical industry.

The emission bandwidths should be adhered to as strictly as possible

The new rules are intended to further reduce emissions. When new BAT conclusions come into force, the emission bandwidths should be complied with as quickly as possible and, in future, as strictly as possible. The BAT conclusions describe the “state of the art” at European level known from national law as the “best available technology”. In future, authorities should set the emission limit values at the strictest level achievable for the specific installation. The operator must then analyze the entire BAT-associated bandwidth and, on this basis, demonstrate and justify whether the values at the strictest end of the BAT-associated emission bandwidth can be achieved. Possible cross-media effects will have to be taken into account. It is also planned that the results of the monitoring of emissions from IED installations will also be made available to the public via the Internet in future. However, the grounds for exclusion under the Environmental Information Act (UIG) should apply here accordingly. Finally, in future, legal entities or associations of persons with a total turnover of more than 1.67 million euros will be subject to a turnover-based fine of up to 3 percent of their total turnover for breaches of the requirements.

Mantelverordnung: Relevant changes to existing BImSchV

In the context of the various amendments to the various BImSchV, the adjustments to the 4th BImSchV and the planned new 45th BImSchV are particularly noteworthy. For example, the scope of application of the 4th BImSchV is to be extended to additional types of plant, such as so-called gigafactories for battery production, pyrolysis plants, forging presses and plants for finishing textiles. The ordinance will also be amended for electrolysers: In future, smaller electrolysers will no longer require a permit under immission control law. Medium-sized electrolysers can be approved in a simplified procedure and only large electrolysers, i.e. those producing more than 50 tons of hydrogen per day, will require an approval procedure with public participation . In addition, various amendments to the 4th BImSchV are planned to speed up the planning process. For example, it is planned, as far as possible under European law, to always apply the simplified approval procedure and to strive for early public participation in the planning phase. Furthermore, the number of turbine types will be reduced from around 330 to 250 for reasons of simplification.

Issuance of a new 45th BImSchV

Of particular importance is the new 45th BImSchV, which is intended to flank the operator obligation for environmental management systems (EMS) provided for in the BImSchG. The introduction of an EMS is expected to be mandatory for all existing plants and for all new plants within the scope of the ordinance that are commissioned after July 1, 2027. The EMS must have certain minimum contents, in particular define environmental targets (e.g. specify waste prevention measures) and include a chemicals inventory and a transformation plan (designed for the year 2030). In addition, the 45th BImSchV imposes far-reaching publication, data collection and verification obligations with regard to the EMS, the latter in the form of an internal auditing or DIN certification obligation, among other things. The 45th BImSchV is intended to oblige plant operators to comply with “sector-specific characteristics”, i.e. the sector-specific BAT conclusions for the textile industry, ferrous metal processing industry, large combustion plants or waste treatment, for example. Until now, the German legislator has largely left the aspect of sector-specific characteristics to companies’ own responsibility and has largely refrained from specifying them in sub-legislation. This is now changing. Furthermore, the bandwidths for resource and energy consumption (so-called environmental performance values) are to be defined in the new 45th BImSchV in accordance with the respective BAT conclusions, which must then be complied with. The details are still open.

Conclusion and outlook

The planned changes to implement the amendment to the IED are far-reaching and of considerable importance for companies. In particular, companies in the energy sector, the chemical industry, commercial waste treatment and intensive livestock farming are strongly recommended to identify their own impact at an early stage and to deal intensively and promptly with the future new requirements and, in particular, their practical implementation. Despite the new elections, the implementation process is expected to continue by summer 2025 at the latest, as the implementation deadline for the IED has already passed.

 

Explore #more

23.03.2026 | Deal Notifications

KPMG Law, KPMG Law AT as well as KPMG in Germany and KPMG in Austria advise GOLDBECK GmbH on the acquisition of 50 percent of the shares in ZAUNERGROUP Holding GmbH

KPMG Law Rechtsanwaltsgesellschaft mbH (KPMG Law) and Buchberger Ettmayer Rechtsanwälte GmbH (KPMG Law AT) as well as KPMG AG Wirtschaftsprüfungsgesellschaft (KPMG in Germany) and KPMG…

19.03.2026 | KPMG Law Insights

Business Judgement Rule in the use of AI: how governing bodies are liable for decisions

If an AI provides the basis for business decisions, the people responsible are liable, not the machine. This makes the use of artificial intelligence risky…

16.03.2026 | KPMG Law Insights

KPIs in the legal department: How legal becomes strategically effective through control, transparency and data analysis

Today, legal departments are facing a strategic turning point: they must reliably hedge risks, but at the same time enable speed, control costs and make…

13.03.2026 | KPMG Law Insights

Commercial courts: when they are worthwhile for companies – and when they are not

Large commercial disputes are given courts specially tailored to their needs: the Commercial Courts. The German legislator introduced it with the Act to Strengthen the

10.03.2026 | Deal Notifications

KPMG Law advises on the sale of Krasemann Hausverwaltung to Buena

KPMG Law Rechtsanwaltsgesellschaft mbH (KPMG Law) provided legal advice to the KRASEMANN family on the sale of KRASEMANN Immobilien- & Gebäudeservice GmbH (KIGS) and KRASEMANN…

09.03.2026 | KPMG Law Insights

MiCAR and whitepaper obligations – what the transitional regulations mean

The Markets in Crypto-Assets Regulation (MiCAR) has been in force for just over a year. Among other things, MiCAR obliges issuers and providers of crypto…

09.03.2026 | In the media

Guest article in Private Banking Magazine: What tokenized banknotes mean in day-to-day treasury operations

The future of payment transactions will be shaped not by new currencies, but by new processing models. A practical report by Marc Pussar (KPMG Law),…

06.03.2026 | In the media

Guest article in smartlegalmarket: Trends for legal departments in 2026 & 2027

KPMG Law has been surveying international legal departments on their challenges for more than ten years. The “Right to Progress” report is now regarded as…

06.03.2026 | KPMG Law Insights

Carve-out: The biggest risks and how the legal workstream avoids them

A carve-out does not usually fail due to a lack of ideas. And not due to a lack of buyers. Nor do they usually fail…

04.03.2026 | In the media

KPMG Law expert with statement in dpn magazine on the Location Promotion Act

Shortly after coming into force, the Location Promotion Act is apparently already having a noticeable effect on the investment plans of institutional market participants. In…

Contact

Dr. Simon Meyer

Partner

Friedenstraße 10
81671 München

Tel.: +49 89 5997606 5021
simonmeyer@kpmg-law.com

Dr. Sandro Köpper

Associate

Prinzenstr. 23
30159 Hannover

Tel.: +49 511 7635078-153
skoepper@kpmg-law.com

© 2026 KPMG Law Rechtsanwaltsgesellschaft mbH, associated with KPMG AG Wirtschaftsprüfungsgesellschaft, a public limited company under German law and a member of the global KPMG organisation of independent member firms affiliated with KPMG International Limited, a Private English Company Limited by Guarantee. All rights reserved. For more details on the structure of KPMG’s global organisation, please visit https://home.kpmg/governance.

KPMG International does not provide services to clients. No member firm is authorised to bind or contract KPMG International or any other member firm to any third party, just as KPMG International is not authorised to bind or contract any other member firm.

Scroll